Not sure if this is the right package, but here goes:
1. Assign tasks in Evolution
2. Click on the clock applet
3. Pick a task and double-click on the percentage in front of it.
4. Change the percentage and press Enter or click outside the box
The value you put in should be saved. Instead it is restored to the previous
value. (Changing these percentages in nautilus still works fine).
Not sure if this is the right package, but here goes:
1. Assign tasks in Evolution
2. Click on the clock applet
3. Pick a task and double-click on the percentage in front of it.
4. Change the percentage and press Enter or click outside the box
The value you put in should be saved. Instead it is restored to the previous
value. (Changing these percentages in nautilus still works fine).