Discussion on IRC was to not disrupt the current testing of xenial-proposed. Robie has already reviewed this SRU and will process it as soon as 0.7.8-49-g9e904bb-0ubuntu1~16.04.2 clears (should be Monday assuming all verification/testing is done.
Discussion on IRC was to not disrupt the current testing of xenial-proposed. Robie has already reviewed this SRU and will process it as soon as 0.7.8-49- g9e904bb- 0ubuntu1~ 16.04.2 clears (should be Monday assuming all verification/ testing is done.