Hi jma,
I understand what you've stated about cancelling the packing (which is the packing of raw materials sent from stock to the production location, right) before cancelling the production order, Ive tried it and it works.

But should'nt it be the other way, because i cancel the production order the movement of the raw materials from stock to production is no longer required and it should be cancelled.

Also is there a way to merge production orders together?
Ive tested the scheduler as per this post (http://www.openobject.com/forum/post55747.html#55747) ive made in the forum.

The result i would expect does not happen ie multiple sales order requirements with the same delivery date merged into a single purchase order or/ and production order. I get individual POs and MOs for each Sales Order inspite of the capacity per cycle being defined.

Also the Production order page displays a total at the bottom which includes the hrs and cycles for cancelled production orders.
Have a look at the attachment - MO/00004 (third last from the bottom) has been cancelled but the totals at the bottom include it.
It should'nt do that, should it? (I'm using the 5.0.0.9 all in one windows version)

Thanks
Fabio