Suspend Holds at time of placement
Bug #1189989 reported by
Dawn Dale
This bug affects 7 people
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Evergreen |
Fix Released
|
Wishlist
|
Unassigned |
Bug Description
Before our upgrade to EG 2.3.6 patrons were able to "suspend" a hold at the time of placing the hold. This option was available on the place hold screen. The option is no longer available on the place hold screen. We would like to ask that it be added back. The goal is for the patron to place a hold on an item and set the activation date so that the hold will be placed at a later date. Some patrons view this as a way to schedule their holds.
Thanks, Dawn
tags: | added: holds opac tpac |
Changed in evergreen: | |
importance: | Undecided → Wishlist |
status: | New → Confirmed |
Changed in evergreen: | |
assignee: | nobody → Terran McCanna (tmccanna) |
Changed in evergreen: | |
assignee: | Terran McCanna (tmccanna) → nobody |
Changed in evergreen: | |
assignee: | nobody → Jason Stephenson (jstephenson) |
status: | Confirmed → In Progress |
tags: | added: signedoff |
Changed in evergreen: | |
milestone: | 3.next → 3.0-alpha |
Changed in evergreen: | |
assignee: | nobody → Galen Charlton (gmc) |
Changed in evergreen: | |
assignee: | Galen Charlton (gmc) → nobody |
Changed in evergreen: | |
status: | Fix Committed → Fix Released |
To post a comment you must log in.
I created a basic patch that should do the job of allowing holds to be suspended at the time of placement.