On Packing, Planned Date is overwritten by Date Done

Bug #524330 reported by Phuong
10
This bug affects 2 people
Affects Status Importance Assigned to Milestone
Odoo Addons (MOVED TO GITHUB)
Fix Released
Medium
OpenERP R&D Addons Team 2

Bug Description

Working on the latest trunk version.

On any packing (incoming, outgoing or internal), there are 3 dates: Order date, Planned date and Done date. When you make a SO or PO, Order date and Planned date are filled in by the system. Then when I process to the packing validation, the Done date will be filled in. The problem is that the Planned date is overwritten by the current date (when I validate the packing), which is also teh Done date. The Planned date should be kept, for statistics to be able to compare the Planned date with the Done date, in order to detect all delays.

Changed in openobject-addons:
status: New → Confirmed
assignee: nobody → Harry (Open ERP) (hmo-tinyerp)
Revision history for this message
Harry (OpenERP) (hmo-tinyerp) wrote :

Hello Phoung,
 real problem is stock.move does not has date_done field. when move done, date_done should fill instead of date_planned. but SHOULD CHECK OTHER FUNCTIONAL EFFECT after this changes. b'z date_planned is most of used to check complete stock move line or not in others place.

Thanks

Revision history for this message
Phuong (phu) wrote : Re: [Bug 524330] Re: On Packing, Planned Date is overwritten by Date Done

Hello,

You're right that this change will impact many other functionnalities. I
have discussed this topic with Fabien, and he suggest this: for Planned
date on the _packing_, it SHOULD NOT be overwritten by the Done date,
and for Planned date on the _stock move line_, it CAN BE overwritten by
the Done date, because this is used for the product stock forecast. Tell
me if this is ok for you.

Thanks

--

Phuong Luu
Project Manager
Tiny sprl
Chaussee de Namur 40
B-1367 Grand-Rosiere
Tel: +32.81.81.37.00

Product-Web: http://www.openerp.com
On Demand-Web: http://ondemand.openerp.com
Corporate-Web: http://www.tiny.be

Harry (Open ERP) a écrit :
> Hello Phoung,
> real problem is stock.move does not has date_done field. when move done, date_done should fill instead of date_planned. but SHOULD CHECK OTHER FUNCTIONAL EFFECT after this changes. b'z date_planned is most of used to check complete stock move line or not in others place.
>
> Thanks
>
>

Changed in openobject-addons:
milestone: none → 6.0
Changed in openobject-addons:
assignee: Harry (Open ERP) (hmo-tinyerp) → nobody
Revision history for this message
qdp (OpenERP) (qdp) wrote :

didn't check if it was still the behavior...

Changed in openobject-addons:
assignee: nobody → OpenERP R&D Addons Team 2 (openerp-dev-addons2)
milestone: 6.0 → 6.0-rc2
importance: Undecided → Medium
Revision history for this message
Kirti Savalia(OpenERP) (ksa-openerp) wrote :

Hello Phuong,

  it has been commit in branch
      lp:~openerp-dev/openobject-addons/ksa-addons2
      Revision NO : 3844
      Revision ID: <email address hidden>

Revision history for this message
Kirti Savalia(OpenERP) (ksa-openerp) wrote :

Hello Phuong,

it has been fixed in branch lp:~openerp-dev/openobject-addons/ksa-addons2
 Revision NO - 3842
 Revision ID: <email address hidden>

Thanks.
      it has been fixed in branch lp:~openerp-dev/openobject-addons/ksa-addons2
      Revision NO : 3844
      Revision ID: <email address hidden>

 Thanks.

Revision history for this message
Kirti Savalia(OpenERP) (ksa-openerp) wrote :

Hello Phuong,

 it has been fixed in branch lp:~openerp-dev/openobject-addons/ksa-addons2
 Revision NO - 3844
Revision ID: <email address hidden>

 Thanks.

Changed in openobject-addons:
status: Confirmed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.