New XUL: "Edit due date" crashes out with "Invalid date format"
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Evergreen |
Fix Released
|
Undecided
|
Unassigned |
Bug Description
* Evergreen rel_2_3 as of 2.3.0-beta1
Method to reproduce:
1. Check out an item to a patron
2. In "Items Out" tab, select the item, right-click, and choose "Edit due date"
3. Change the date to, say, "2012-08-07"*
* Note that our system is configured with the actor.org_
Expected results:
The due date will be changed to 2012-08-07.
Actual result:
The attempt fails, with the following error displayed to the staff user:
method=
params=
THROWN:
{"payload"
STATUS:
Changed in evergreen: | |
status: | Fix Committed → Fix Released |
Looks to be caused by an errant e:
http:// git.evergreen- ils.org/ ?p=working/ Evergreen. git;a=shortlog; h=refs/ heads/user/ tsbere/ fix_timestamp_ js